8.5 Physical Test Limits

Physical Test Limits

Table 23 lists test limits for service-aged silicone filled transformer oil. If any of these limits are exceeded, treat the oil in whatever manner is appropriate to return the oil to serviceable condition.

Table 23 Physical Test Limits

If the above limits are exceeded in the DGA, the silicone oil should be filtered, dried, or treated to correct the specific problem.

GlobeCore GmbH is one of the world leaders in industrial manufacturing. Products of GlobeCore are used in production of bitumen emulsions, transformer oil regeneration and purification, fuel blending, biodiesel production and emulsification of virtually any materials.

The head office is located in Oldenburg, Germany. Our systems have been supplied to and are successfully operated in 70 countries. A network of 17 dealers supports global sales and services.

globecore-oldenburg-germany-min

GlobeCore established representative offices in United States, and South Africa and in United Arab Emirates to extend reach and improve efficiency. We actively expand production and sales territories, develop our infrastructure and introduce new additional services.

обновлено: September 30, 2016 автором: dannik