Power Transformer
What repair procedures apply to power line transformers after overload failures?
- 该话题包含 1个回复,2 人参与,最后由 更新于 1周、 1天前 。
Answers
-
一月 23, 2026 12:26 下午 by Yara Haddad
Overload repairs include oil sampling (DGA, moisture), insulation resistance testing, winding resistance, tan-delta, bushing checks, core/coil inspection, OLTC inspection (if present), leak sealing, and thermal hotspot mitigation. Units failing dielectric or mechanical integrity are replaced.