Power Transformer
How does Hyundai Power Transformers USA Inc perform acceptance testing before commissioning high voltage transformers into utilities?
- 该话题包含 1个回复,2 人参与,最后由 更新于 6天、 2小时前 。
Answers
-
一月 24, 2026 8:13 上午 by Li Wei
Routine and type testing under IEEE/IEC includes ratio, impedance, dielectric, partial discharge, temperature rise, impulse, and oil analysis. Reports are certified for utility acceptance.