What are the key steps in road construction using bitumen?
- 该话题包含 1个回复,2 人参与,最后由 更新于 1年前 。
Answers
-
十一月 20, 2024 6:07 下午 by Amir Khan
Key steps are: site preparation and grading, subgrade compaction, laying sub-base and base layers, applying tack or prime coats, mixing and laying asphalt layers (binder and surface courses), compaction of asphalt layers, and finishing with quality control inspections to ensure compliance with specifications.