What engineering challenges arise when designing a large power transformer for utility substations?
- 该话题包含 1个回复,2 人参与,最后由 更新于 1周、 3天前 。
Answers
-
一月 19, 2026 10:41 下午 by David Wilson
Challenges include managing thermal hotspots, dielectric clearances, fault forces, short-circuit withstand, acoustic noise, cooling system optimization, OLTC reliability, transport weight limits, and meeting strict loss guarantees and standards.