• Main Oil Purification Equipment
  • Products
    • 油的再生产
      • CMM-R油再生系统
      • 实验室滤油装置СММ-0,001U
    • 油脱气、热油真空干燥
      • CMM-0.6除气滤油车
      • СММur-1L移动式采油厂
      • CMM-1油处理装置
      • CMM-4/7便携式除油装置
      • CMM-6/7移动式除气装置
      • CMM-10移动式采油厂
    • 滤油系统
      • CMM-1,0CF除油除水装置
      • CMM-4,0F滤油装置
    • 沸石油干燥装置
      • ZP-260吸附剂筒
    • 油加热
      • 内联油加热器ppm。蒸汽油加热
    • 真空干燥箱
      • 变压器真空炉
    • 电磁磨机
      • AVS-100搅拌机。电磁磨机
      • AVS-150化学搅拌机
    • Accessories & Components
  • Globecore Tech School
    • Webinar Registration
  • Contatos
  • Sukhovey (Mojave Heat) 热风干燥
  • 变压器真空炉
  • 变压器安全系统 TSS
  • CMM-R油再生系统
  • ZP-260吸附剂筒
  • CMM-0.6除气滤油车
  • CMM-0.6除气滤油车
  • 电磁磨机

What procedures are followed when Drying Transformers After Repairs to ensure optimal performance?

Asked: 十月 4, 2024 8:31 下午 by Ashley Hall
  • 该话题包含 1个回复,2 人参与,最后由Ahmed Abdullah 更新于 1年、 2月前 。

Answers

  • 十月 4, 2024 8:56 下午 by Ahmed Abdullah

    When Drying Transformers After Repairs, a systematic procedure is followed to ensure that moisture and contaminants introduced during the repair process are effectively removed, guaranteeing optimal transformer performance. The process begins with inspecting the transformer to identify any areas that may have been exposed to moisture or contaminants during repairs. Pre-heating the transformer oil is then conducted to reduce its viscosity, facilitating more efficient moisture removal. The Air Drying System is activated, circulating dry, heated air through the oil to absorb and evaporate moisture. Filtration systems are employed to remove any particulate matter or debris that may have entered the oil during repairs. Vacuum dehydration techniques may be utilized to further extract dissolved gases and moisture, ensuring thorough drying. Throughout the drying process, monitoring tools track moisture levels, temperature, and humidity to ensure that drying objectives are met. Quality tests are performed post-drying to verify the oil’s dielectric strength and purity. Finally, documentation of the drying process and any adjustments made ensures that records are maintained for future reference, supporting the transformer’s long-term reliability and performance.

Articles by Topic

Only registered users can answer. No account? Sign up!

Ask question

GlobeCore Related Posts

plants-image

SSC-15 Zeolite Drying Cabinet

plants-image

Mojave Heat (Sukhovey): Hot Air Dryer Unit

plants-image

BRPS Zeolite Regeneration Block

  • Main Oil Purification Equipment
  • Products
  • Globecore Tech School
  • Contatos

® Copyright by - 2025 © GlobeCore

GlobeCore, Sadovskogo,14
乌克兰波尔塔瓦,36034

本網站使用 Cookie 來提升您的體驗。繼續瀏覽即表示您同意我們使用 Cookie。 請參閱我們的隱私權政策以了解更多資訊。

forum-form-logo

Sign up

forum-form-logo

Sign in

To continue log in with Google.

Google Login