Necessary to optimize voltage-current ratio, minimize losses, stabilize grid, and interconnect regions.
PF = kW / kVA = cos? from phase angle between V and I.
A Unit Auxiliary Transformer (UAT) feeds the turbine-generator island and plant auxiliaries directly from the generator output during normal operation. Loads include pumps, fans, heaters, controls, and balance-of-plant equipment. It works with a Station Service Transformer for startup and blackout recovery.
A step-up transformer raises generator voltage (e.g. 13-24 kV) to transmission voltage (110-400 kV+). Higher voltage reduces current for the same power, lowering I²R losses and enabling long-distance power transfer. These generator step-up (GSU) units are critical for grid efficiency and stability.
For a transformer, apparent power output is calculated as S = V? × I? for single phase, or S = ?3 × V? × I? for three phase, where V? is the secondary line voltage and I? is the line current. This gives kVA or MVA. Real power output is P = S × power factor. When calculating, engineers use rated voltages and currents from the nameplate for maximum output, or measured load values for real operating power. They also consider efficiency, since some input power is lost as heat and not delivered to the load.
Power transformers fail when subjected to short-circuits, overvoltages, internal insulation breakdown, thermal runaway, or gas accumulation from oil degradation. Utilities mitigate failure through relays, DGA, and condition monitoring.
Voltage class, MVA rating, losses guarantees, materials, customization, logistics, and commodity cycles influence pricing.
Step-up conversion raises generator voltage to transmission levels, reducing I²R losses and enabling long-distance power transfer.
In grid infrastructure, electrical power transformers are defined as primary assets that interface different voltage levels and network segments. They must satisfy grid codes for voltage regulation, reliability indices, and fault performance. Their design is standardized around insulation levels, short-circuit capability, loss targets, and monitoring provisions. They are typically owned and maintained by utilities or transmission operators and are subject to rigorous asset management practices, including condition monitoring, diagnostics, and long-term planning.
一月 20, 2026 5:47 下午 回复至: What effect does hydrolysis have when the moisture level in a transformer increases? #330630When moisture increases in a transformer, hydrolysis becomes one of the main aging mechanisms of the cellulose insulation. Water reacts with the polymer chains in paper and gradually breaks them down, reducing the degree of polymerization and mechanical strength. This process is irreversible and accelerates with temperature. Even moderate moisture can significantly shorten insulation life over time, which is why controlling moisture is more critical for long-term reliability than its immediate effect on oil dielectric strength alone.
During refurbishment, AC/DC converters or rectifier transformers undergo insulation resistance tests, polarization index, winding resistance, TTR, and often dielectric tests (applied and induced voltage). Oil-filled units get DGA and oil breakdown tests. Special attention is paid to DC stress patterns on insulation and rectifier connections. Visual inspection checks for thermal damage, loose connections, and contamination. Based on results, insulation drying, re-gasketing, and component replacement may be performed before final high-potential and functional tests.
十一月 12, 2025 7:21 下午 回复至: Interested in collaboration for colloid mill and bitumen equipment. #327647GlobeCore colloid mills and modification systems integrate easily into existing PMB and CRMB plants. Technical cooperation and customization are available.
十一月 11, 2025 11:18 上午 回复至: Need pricing and operation manual for TOR-100 and TOR-80 breakdown voltage testers. #327498TOR-80 and TOR-100 testers are automatic BDV measuring devices compliant with IEC 60156. Each unit includes a test cell, control software, and optional calibration set. Manual and pricing will be provided.
十一月 11, 2025 12:06 上午 回复至: Inquiry about potential cooperation to participate in a transformer oil regeneration plant tender. #327456GlobeCore manufactures complete transformer oil regeneration systems compliant with international standards. We can provide tender documentation, technical details, and cooperation terms.
The CMM-6RL is a transformer oil regeneration plant with a capacity of 6 m³/h. It removes acids, sludge, and oxidation products, restoring dielectric strength and color. We will send you pricing, lead time, and a technical datasheet upon request.
十一月 8, 2025 5:58 上午 回复至: Oil filtration and degassing plant Oil filter with size 1000 liters / hour #327186The CMM-1.0 transformer oil purification plant operates at 1000 L/h. It performs filtration, dehydration, and degassing of insulating oil under vacuum. We will provide a quotation including pricing, technical specifications, and delivery terms.
十一月 7, 2025 2:33 上午 回复至: Please quote on the following: CMM-4 mobile unit for powered transformer oil processing #327070The CMM-4 mobile oil processing unit purifies transformer oil at 4 m³/h and can operate directly with energized transformers. A quotation will include pricing, delivery, and technical data.
The CMM-4 is a transformer oil purification plant with 4 m³/h capacity. It removes water, gases, and impurities under vacuum. We will prepare a quotation including delivery time and warranty details.
十一月 5, 2025 10:04 上午 回复至: What is the price and lead time for the CMM-G Wind Turbine Gearbox Oil Changer. #326901The CMM-G unit is designed for wind turbine gearbox oil changing and filtration. It includes heating, fine filtration (up to 3 µm), flow control, and safe oil draining/refilling at height. Power supply options: 400-480V, 3-phase. Typical lead time is 6-8 weeks.
It includes pumps, heaters, filters, vacuum chambers, and control panels. GlobeCore systems are modular and customizable – suitable for substations, power plants, or industrial transformers of any voltage class.
-