Output S = V × I (1?) or S = ?3 × V × I (3?). Real output depends on load PF: P = S × PF.
Tan delta (dissipation factor) test evaluates dielectric health of windings, bushings, and insulation oil. It measures how much energy is lost as heat due to dielectric imperfections. High tan ? indicates moisture, aging, contamination, or partial discharge activity. Utilities rely on trend analysis and comparison with IEEE/IEC limits during maintenance and commissioning.
Apparent power S (kVA/MVA) combines real P (kW) and reactive Q (kVAr). Defined as S = ?(P² + Q²). Governs transformer sizing.
一月 27, 2026 4:26 下午 回复至: What is the main difference between distribution transformer and power transformer? #332283Power transformers handle transmission-level MVA and operate near rated load; distribution units serve LV loads and excel at part-load efficiency.
Winding calculators allow designers to determine turns, conductor gauge, window fill, flux density, and copper losses based on kVA, voltage, and frequency. They help verify that thermal and mechanical limits are respected.
Station transformers feed auxiliary loads such as pumps, fans, controls and lighting from generator or grid voltage to service voltage.
Single-phase distribution transformers (5-50 kVA) contain several kilograms to tens of kilograms of copper depending on kVA, impedance, and design.
Maintenance involves inspections, oil sampling and DGA tests, insulation diagnostics, bushing checks, OLTC servicing, cooling system verification, partial discharge monitoring, thermographic surveys, grounding inspections, and trending of electrical parameters. The goal is to prolong service life and prevent unplanned outages.
一月 22, 2026 5:34 上午 回复至: How does the regeneration process of the CMM-12R oil regeneration systems improve oil quality? #331165The regeneration process uses sorbent adsorption, filtration, and vacuum treatment to remove contaminants, resulting in significantly improved dielectric strength, oxidation resistance, reduced acid number, and lowered gas solubility, thus restoring oil properties to meet standards.
The US-6S vacuum system is capable of achieving an operating vacuum around 1 mbar, which promotes rapid moisture evaporation even from deep insulation layers. Temperature control typically ranges from ambient up to about 120°C, enabling effective drying without damaging paper insulation. Automated systems regulate both parameters for controlled processing.
一月 20, 2026 1:18 下午 回复至: What method does the TOR-5 online monitoring system use to remove moisture from the oil? #330565The TOR-5 removes moisture from the oil by a sorption-based drying method using zeolite-filled adsorber cartridges. Oil is continuously circulated through the sorbent, where dissolved water is physically adsorbed onto the zeolite surface. There is no heating or vacuum involved in the standard configuration, which makes the process safe for energized transformers. The key idea is long-term stabilization: by keeping oil moisture low, the system gradually draws water out of the paper insulation through equilibrium, reducing overall insulation moisture over time.
一月 20, 2026 12:24 下午 回复至: Does the TOR-5 system dry only the oil, or also the paper insulation? #330547The TOR-5 does not dry only the oil in isolation – its main practical effect is the gradual reduction of moisture in the entire insulation system, including paper. Since moisture continuously migrates between oil and cellulose, drying the oil creates a concentration gradient that pulls water out of the paper over time. This is a slow equilibrium-driven process, but in long-term operation it leads to a real decrease of paper moisture content. It is not a fast regeneration method, but a continuous conditioning approach that stabilizes the whole insulation system.
一月 19, 2026 5:26 上午 回复至: What is a transformer power box used for in electrical distribution? #330294A transformer power box (kiosk or pad-mounted enclosure) houses a distribution transformer and protective devices that step medium voltage down to low voltage for buildings or residential streets. The box provides physical protection, tamper resistance and weatherproofing while enabling underground distribution networks common in urban areas.
Filtration units for bitumen lines are available with single or duplex housings and mesh sizes down to 200 microns. They ensure continuous operation without stopping production.
十一月 10, 2025 10:58 上午 回复至: Need a quotation for a Fuller’s Earth transformer oil regeneration system with 3000 L/h flow rate. #327388The CMM-R3 regeneration unit uses Fuller’s Earth sorbent to restore oil quality, removing acids and oxidation products. We will send a quotation and technical data sheet.
The CMM-1CF mobile oil station performs purification and transfer of insulating oil with 1 m³/h capacity. Please confirm voltage and destination country so we can send a quotation including transport cost.
十一月 6, 2025 3:32 下午 回复至: Request for Price Offer – Oil vacuum drying unit for Hermetic Transformers #327028GlobeCore designs vacuum drying units for hermetic transformers to remove moisture under deep vacuum and controlled temperature. Please share transformer size and core weight for technical and pricing details.
Transformer oil filtration units remove moisture, gas, and particles from insulating oil to restore its dielectric strength. GlobeCore’s CMM units are trusted worldwide for fast, onsite purification – ensuring your transformer operates safely and efficiently.
Mobil Jet engine oil is designed to protect against wear, deposits, and oxidation in demanding aviation conditions. GlobeCore systems ensure Mobil Jet oils remain free of contaminants, extending their effective life.
ISO 68 turbine oil is a higher-viscosity lubricant for steam, gas, and hydraulic turbines requiring thicker film strength. GlobeCore purification units filter and dry ISO 68 oils to maintain stability in demanding conditions.
-
作者帖子