What is the typical vacuum level required for a 75/95 MVA transformer rated 220/110-70/15 kV during drying and oil processing?
- 该话题包含 1个回复,2 人参与,最后由 更新于 1天、 11小时前 。
Answers
-
一月 28, 2026 8:04 下午 by Olga Ivanova
For a 75/95 MVA transformer rated 220/110-70/15 kV, the typical vacuum level during insulation drying is usually in the sub-millibar range, around 0.2-0.5 mbar, and in many procedures it is kept below 1 mbar depending on temperature and moisture condition. During oil processing and degassing, vacuum oil purification units normally operate at a slightly higher level, commonly around 1-3 mbar, which is sufficient to efficiently remove dissolved gases and moisture from transformer oil.