• Main Oil Purification Equipment
  • Products
    • 油的再生产
      • CMM-R油再生系统
      • 实验室滤油装置СММ-0,001U
    • 油脱气、热油真空干燥
      • CMM-0.6除气滤油车
      • СММur-1L移动式采油厂
      • CMM-1油处理装置
      • CMM-4/7便携式除油装置
      • CMM-6/7移动式除气装置
      • CMM-10移动式采油厂
    • 滤油系统
      • CMM-1,0CF除油除水装置
      • CMM-4,0F滤油装置
    • 沸石油干燥装置
      • ZP-260吸附剂筒
    • 油加热
      • 内联油加热器ppm。蒸汽油加热
    • 真空干燥箱
      • 变压器真空炉
    • 电磁磨机
      • AVS-100搅拌机。电磁磨机
      • AVS-150化学搅拌机
    • Accessories & Components
  • Globecore Tech School
    • Webinar Registration
  • Contatos
  • Sukhovey (Mojave Heat) 热风干燥
  • 变压器真空炉
  • 变压器安全系统 TSS
  • CMM-R油再生系统
  • ZP-260吸附剂筒
  • CMM-0.6除气滤油车
  • CMM-0.6除气滤油车
  • 电磁磨机

How is capacitor voltage transformer testing conducted?

Asked: 九月 17, 2024 8:15 下午 by Gabriel Silva
  • 该话题包含 1个回复,2 人参与,最后由Linda Jackson 更新于 1年、 2月前 。

Answers

  • 九月 17, 2024 8:32 下午 by Linda Jackson

    Capacitor voltage transformer testing is typically conducted using a variety of specialized equipment and procedures to ensure accuracy and safety. Initially, the capacitor voltage transformer (CVT) is disconnected from the system to prevent accidental energization during testing. The testing process usually involves measuring parameters such as capacitance, insulation resistance, and power factor. Specialized testers such as the Globecore Capacitance and Power Factor Tester are essential for this, as they provide precise measurements critical for assessing the CVT’s operational integrity. Additionally, insulation resistance testing is performed using a high-voltage insulation tester, ensuring that the insulation material can withstand operating conditions. It’s important to follow all safety protocols during testing, including using appropriate personal protective equipment and ensuring that the testing environment is secure. After conducting tests, the results are analyzed to determine if the CVT is operating within specified limits, allowing for maintenance or replacement if necessary. Regular capacitor voltage transformer testing is crucial for the longevity and reliability of power systems.

Articles by Topic

Only registered users can answer. No account? Sign up!

Ask question

GlobeCore Related Posts

plants-image

TOR-2 Hydrogen and Moisture Analyzer for Transformer Oil Monitoring

plants-image

TOR-3 (TOR-3 SL) Oil Tan Delta Tester

plants-image

TOR-80 (TOR-80 LSL) Breakdown Voltage Tester

  • Main Oil Purification Equipment
  • Products
  • Globecore Tech School
  • Contatos

® Copyright by - 2025 © GlobeCore

GlobeCore, Sadovskogo,14
乌克兰波尔塔瓦,36034

本網站使用 Cookie 來提升您的體驗。繼續瀏覽即表示您同意我們使用 Cookie。 請參閱我們的隱私權政策以了解更多資訊。

forum-form-logo

Sign up

forum-form-logo

Sign in

To continue log in with Google.

Google Login