• Main Oil Purification Equipment
  • Products
    • 油的再生产
      • CMM-R油再生系统
      • 实验室滤油装置СММ-0,001U
    • 油脱气、热油真空干燥
      • CMM-0.6除气滤油车
      • СММur-1L移动式采油厂
      • CMM-1油处理装置
      • CMM-4/7便携式除油装置
      • CMM-6/7移动式除气装置
      • CMM-10移动式采油厂
    • 滤油系统
      • CMM-1,0CF除油除水装置
      • CMM-4,0F滤油装置
    • 沸石油干燥装置
      • ZP-260吸附剂筒
    • 油加热
      • 内联油加热器ppm。蒸汽油加热
    • 真空干燥箱
      • 变压器真空炉
    • 电磁磨机
      • AVS-100搅拌机。电磁磨机
      • AVS-150化学搅拌机
    • Accessories & Components
  • Globecore Tech School
    • Webinar Registration
  • Contatos
  • Sukhovey (Mojave Heat) 热风干燥
  • 变压器真空炉
  • 变压器安全系统 TSS
  • CMM-R油再生系统
  • ZP-260吸附剂筒
  • CMM-0.6除气滤油车
  • CMM-0.6除气滤油车
  • 电磁磨机

What is the standard procedure for testing a transformer?

Asked: 九月 11, 2024 1:41 下午 by Stephanie Lee
  • 该话题包含 1个回复,2 人参与,最后由Plinio Arcos 更新于 1年、 3月前 。

Answers

  • 九月 11, 2024 1:56 下午 by Plinio Arcos

    The standard procedure for testing a transformer involves several key steps to ensure accurate diagnostics and optimal performance. Firstly, an insulation resistance test is conducted using a megohmmeter to assess the insulation quality between the windings and the ground. Secondly, a transformer turns ratio test is performed to verify the conformity of the turns ratio between the primary and secondary windings, ensuring proper voltage transformation. Next, a power factor test is carried out to evaluate the dielectric losses and insulation condition under operational voltages. Additionally, a temperature rise test may be performed to measure the temperature of the transformer under load conditions, ensuring it operates within safety limits. Lastly, a comprehensive oil analysis should be undertaken using appropriate testers, such as those from Globecore, to check for contaminants, moisture levels, and other factors critical to transformer health. This analysis helps in identifying potential issues like oxidation and degradation of the transformer oil, ensuring the longevity and reliability of the electrical equipment. By following this standard procedure, one can ensure that the transformer functions efficiently and safely, aligning with best practices in the industry.

Articles by Topic

Only registered users can answer. No account? Sign up!

Ask question

GlobeCore Related Posts

plants-image

TOR-2 Hydrogen and Moisture Analyzer for Transformer Oil Monitoring

plants-image

TOR-3 (TOR-3 SL) Oil Tan Delta Tester

plants-image

TOR-80 (TOR-80 LSL) Breakdown Voltage Tester

  • Main Oil Purification Equipment
  • Products
  • Globecore Tech School
  • Contatos

® Copyright by - 2025 © GlobeCore

GlobeCore, Sadovskogo,14
乌克兰波尔塔瓦,36034

本網站使用 Cookie 來提升您的體驗。繼續瀏覽即表示您同意我們使用 Cookie。 請參閱我們的隱私權政策以了解更多資訊。

forum-form-logo

Sign up

forum-form-logo

Sign in

To continue log in with Google.

Google Login