• Home
  • Products
    • TÁI SINH DẦU
      • HỆ THỐNG TÁI SINH DẦU CMM-R
      • HỆ THỐNG LỌC PHÒNG THÍ NGHIỆM СММ-0,001U
    • KHỬ KHÍ DẦU, SẤY DẦU NHIỆT CHÂN KHÔNG
      • TẢI LỌC KHỬ KHÍ DẦU CMM-0.6
      • MÁY DI DỘNG DẦU СММur-1L
      • THIẾT BỊ XỬ LÝ DẦU СММ-1Н
      • THIẾT BỊ KHỬ KHÍ CẦM TAY CMM-4/7
      • THIẾT BỊ DI ĐỘNG KHỬ KHÍ CMM-6/7
      • MÁY DẦU DI DỘNG CMM-10
    • HỆ THỐNG LỌC DẦU
      • CMM-1,0CF THIẾT BỊ KHỬ NƯỚC KHỎI DẦU
      • THIẾT BỊ LỌC DẦU CMM-4,0F
    • THIẾT BỊ SẤY DẦU ZEOLITE
      • KHAY CHỨA CHẤT HẤT THỤ ZP-260 SORBENT
    • GIA NHIỆT DẦU
      • GIA NHIỆT TRỰC TIẾP DẦU PPM VÀ GIA NHIỆT DÒNG DẦU
    • LÒ SẤY CHÂN KHÔNG
      • LÒ CHÂN KHÔNG BIẾN ÁP
    • Máy Xay Điện Từ
      • Máy Trộn AVS-100. Máy Xay Điện Từ
      • Máy Trộn Hóa Chất AVS-150
    • MÁY NHŨ TƯƠNG HÓA NHỰA BITUM
      • MÁY USB-2 NHŨ TƯƠNG HÓA BITUM NĂNG SUẤT 2 M3/GIỜ
      • MÁY USB-2 SẢN XUẤT BITUMEN NĂNG SUẤT SẢN XUẤT 8 M3/GIỜ
      • Bộ lọc bitum FB
    • MÁY BIẾN TÍNH BITUM. SẢN XUẤT BITUMEN BIẾN TÍNH
      • MÁY USB-3 HỆ THỐNG THỬ NGHIỆM BITUM BIẾN TÍNH
      • MÁY USB-3 BIẾN TÍNH BITUM CÔNG SUẤT 16 M3/GIỜ
      • USB-4 BỂ THU BITUM BIẾN TÍNH (USB-3)
    • HỆ THỐNG THỬ NGHIỆM CHẤT LIỆU NHŨ TƯƠNG BITUM
      • MÁY USB-3 HỆ THỐNG THỬ NGHIỆM BITUM BIẾN TÍNH
    • Accessories & Components
  • Globecore Tech School
    • Webinar Registration
  • Publications
  • About
  • Contacts
  • THIẾT BỊ SẤY KHÍ NÓNG: Sukhovey (MOJAVE HEAT)
  • LÒ CHÂN KHÔNG BIẾN ÁP
  • HỆ THỐNG AN TOÀN MÁY BIẾN ÁP TSS
  • HỆ THỐNG TÁI SINH DẦU CMM-R
  • KHAY CHỨA CHẤT HẤT THỤ ZP-260 SORBENT
  • TẢI LỌC KHỬ KHÍ DẦU CMM-0.6
  • TẢI LỌC KHỬ KHÍ DẦU CMM-0.6
  • Máy Xay Điện Từ

How is capacitor voltage transformer testing conducted?

Asked: September 17, 2024 at 8:15 pm by Gabriel Silva
  • This topic has 1 reply, 2 voices, and was last updated 1 year, 2 months ago by Linda Jackson.

Answers

  • September 17, 2024 at 8:32 pm by Linda Jackson

    Capacitor voltage transformer testing is typically conducted using a variety of specialized equipment and procedures to ensure accuracy and safety. Initially, the capacitor voltage transformer (CVT) is disconnected from the system to prevent accidental energization during testing. The testing process usually involves measuring parameters such as capacitance, insulation resistance, and power factor. Specialized testers such as the Globecore Capacitance and Power Factor Tester are essential for this, as they provide precise measurements critical for assessing the CVT’s operational integrity. Additionally, insulation resistance testing is performed using a high-voltage insulation tester, ensuring that the insulation material can withstand operating conditions. It’s important to follow all safety protocols during testing, including using appropriate personal protective equipment and ensuring that the testing environment is secure. After conducting tests, the results are analyzed to determine if the CVT is operating within specified limits, allowing for maintenance or replacement if necessary. Regular capacitor voltage transformer testing is crucial for the longevity and reliability of power systems.

Articles by Topic

Only registered users can answer. No account? Sign up!

Ask question

GlobeCore Related Posts

plants-image

TOR-2 Hydrogen and Moisture Analyzer for Transformer Oil Monitoring

plants-image

TOR-3 (TOR-3 SL) Oil Tan Delta Tester

plants-image

TOR-80 (TOR-80 LSL) Breakdown Voltage Tester

  • Home
  • Products
  • Globecore Tech School
  • Contacts

® Copyright by - 2025 © GlobeCore

GlobeCore, Sadovskogo,14 Poltava, Ukraine, 36034

Trang web này sử dụng cookie để cải thiện trải nghiệm của bạn. Bằng cách tiếp tục duyệt, bạn đồng ý với việc chúng tôi sử dụng cookie. Đọc thêm trong Chính sách bảo mật của chúng tôi.

forum-form-logo

Sign up

forum-form-logo

Sign in

To continue log in with Google.

Google Login