- Debes estar registrado para crear debates nuevos.
Ahmed Abdullah
Ahmed Abdullah
Respuestas de foro creadas
-
AutorEntradas
-
enero 28, 2026 a las 4:10 pm en respuesta a: Which equipment would you recommend for simple filtration and removal of solid particles from pivot hydraulic oil used in TL pivots? #332420Ahmed AbdullahMiembro
For simple «polishing» of TL pivot hydraulic oil (mainly solid particles), I’d use a portable GlobeCore CMM-F / CMM-4.0F filtration cart: it’s designed specifically to remove solid particulate contamination from industrial/lube oils on-site. If you also see moisture issues (condensation, milky oil), step up to a GlobeCore CMM-LT hydraulic oil purification unit, which adds multistage fine filtration plus dehydration via heating/vacuum.
enero 28, 2026 a las 1:57 am en respuesta a: What is the range of no load power factor of transformer? #332357Ahmed AbdullahMiembroNo-load PF is low, typically 0.05-0.2 lagging due to dominant magnetizing reactive current and minimal real power.
enero 27, 2026 a las 8:27 am en respuesta a: Why transformers are important in AC power generations? #332205Ahmed AbdullahMiembroAC enables electromagnetic induction and transformer action, allowing voltage stepping for loss reduction, flexible network design, and multi-voltage distribution tiers. This was historically decisive in AC winning over DC for bulk grids.
Ahmed AbdullahMiembroPower transformer ratings use kVA or MVA because they depend on apparent power, which represents the combination of voltage and current regardless of load power factor. Losses and heating relate to voltage and current, not only to real power in kW or MW. Using MVA allows the same transformer to serve different types of loads with different power factors as long as current and voltage limits are respected. It also simplifies coordination across systems, since other apparatus like generators and switchgear are often rated in apparent power too.
enero 26, 2026 a las 3:24 am en respuesta a: Does a transformer use power without load and why? #331963Ahmed AbdullahMiembroYes. A transformer draws magnetizing current at no-load to energize the core. This produces hysteresis and eddy current losses, known as no-load losses. Even without load, these losses appear as heat and reactive power consumption.
enero 25, 2026 a las 2:33 pm en respuesta a: Why are substation power transformers required to operate under strict thermal limits? #331869Ahmed AbdullahMiembroTransformer insulation aging is temperature-dependent. Exceeding thermal limits accelerates cellulose degradation, reduces dielectric strength, and shortens operational life. Thermal monitoring prevents failure and ensures loading compliance.
enero 25, 2026 a las 10:42 am en respuesta a: How are 3-phase transformer power calculations performed? #331839Ahmed AbdullahMiembroThree-phase transformer power is calculated as S = ?3 × VLL × Iline for apparent power. Real power includes power factor. Engineers also consider winding configurations (Y/?), impedance, temperature rise and loading limits.
enero 24, 2026 a las 2:49 am en respuesta a: How is rated power calculated for a transformer under load? #331579Ahmed AbdullahMiembroRated power is apparent power at rated voltage and current, with limits set by thermal rise and insulation class.
enero 23, 2026 a las 9:25 pm en respuesta a: What is the definition of power transformers in grid applications? #331539Ahmed AbdullahMiembroPower transformers enable voltage adaptation in the grid for transmission efficiency and safe delivery to consumers.
enero 22, 2026 a las 6:56 am en respuesta a: What does a shore power transformer do in marine applications? #331185Ahmed AbdullahMiembroIt isolates ship electrical systems from dock power, matches voltage and frequency when needed, and reduces galvanic corrosion through isolation.
enero 21, 2026 a las 7:19 pm en respuesta a: What industries require European power transformers for compatibility? #331018Ahmed AbdullahMiembroIndustries operating in Europe or using European standard voltages and grid codes require compatible transformers. These include utilities, manufacturing plants, data centers, rail networks, offshore wind, industrial parks and large commercial complexes. Equipment exported into Europe from other regions also needs transformers designed for European frequency, voltage levels, insulation coordination and standards like EN and IEC. Multinational companies often standardize on European transformer designs across multiple sites for easier engineering and spare parts management.
enero 21, 2026 a las 9:33 am en respuesta a: How are Hyundai power transformers Alabama facilities handling factory testing and refurbishment cycles for large power units? #330854Ahmed AbdullahMiembroHyundai’s Alabama facilities conduct factory acceptance tests (ratio, impedance, losses, insulation, partial discharge, and withstand tests) before shipment. Refurbishment cycles may include bushing replacement, OLTC inspection, gasket renewal, corrosion control, oil filtration/degasification, and relay upgrades. After refurbishment each transformer is re-tested to verify compliance with IEC/IEEE standards before being returned to substation service.
enero 20, 2026 a las 10:44 pm en respuesta a: In what sectors are GE power transformers deployed? #330700Ahmed AbdullahMiembroGE transformers are deployed in utilities, petrochemical plants, steel mills, data centers, and renewable generation projects.
enero 20, 2026 a las 12:03 pm en respuesta a: Is separate TOR-5 online monitoring system required for each transformer? #330541Ahmed AbdullahMiembroNo — the TOR-5 is an online monitoring and diagnostics system for transformer oil; it measures parameters such as moisture, dissolved gases, temperature and trends but does not physically generate or purify oil. Oil generation, dehydration, degassing and particle removal require mechanical treatment steps (heating, vacuum dehydration, filtration, adsorption/regeneration) that are performed by dedicated oil purification and regeneration equipment.
In practice you should use TOR-5 to continuously monitor oil condition and set alarm thresholds so that, when moisture, dissolved gas or contamination exceed limits, a vacuum oil purifier or oil regeneration unit is scheduled to treat the dielectric fluid. Integrating TOR-5 alarms with a maintenance program allows targeted use of vacuum dehydrators, filters and adsorbents to restore transformer oil quality and extend insulation life.
Ahmed AbdullahMiembroCommon transformer faults include winding insulation breakdown, turn-to-turn shorts, bushing flashover, oil degradation, partial discharge, OLTC contact wear, cooling system failure, and core grounding faults. These issues originate from thermal aging, moisture ingress, overvoltage events, mechanical shocks, and contamination. Protection systems detect abnormalities through differential relays, sudden pressure relays, Buchholz relays, and thermal alarms.
Ahmed AbdullahMiembro50 MVA class power transformers are used in transmission and sub-transmission substations, large industrial complexes, mining operations, data centers, and large renewable plants. At this rating, units commonly operate in the 69-230 kV class and serve as primary step-downs to industrial MV feeders or as interties between transmission voltage levels.
noviembre 10, 2025 a las 5:16 pm en respuesta a: Request for dealer price for TOR-100 breakdown analyzer with IEC 156 test vessel and mushroom electrodes. #327430Ahmed AbdullahMiembroThe TOR-100 is a high-voltage breakdown tester (up to 100 kV) for transformer and insulating oils. It includes the IEC 156 vessel and electrode set. Dealer pricing and delivery details will be provided.
noviembre 9, 2025 a las 12:51 am en respuesta a: Inquiry for a vacuum transformer drying plant suitable for transformers rated 1000-5000 kVA, including process duration information for comparison with the current method. #327258Ahmed AbdullahMiembroGlobeCore vacuum drying plants are designed for transformers up to 5000 kVA. The process time depends on transformer size and insulation condition but typically ranges from 8 to 20 hours. We will provide a quotation and process details.
noviembre 6, 2025 a las 2:27 pm en respuesta a: REQUEST FOR QOTATION AND SUPPORTING DOCUMENTS FOR A TRANSFORMER OIL MOISTURE AND TEMPERATURE ANALYZER #327024Ahmed AbdullahMiembroThe TOR-1 moisture analyzer measures water content in transformer oil in ppm with temperature compensation. GlobeCore can provide full supporting documents, including CE, ISO, and calibration certificates.
septiembre 9, 2025 a las 3:25 pm en respuesta a: What is important in bitumen storage tank design? #325010Ahmed AbdullahMiembroDesign should prioritize insulation, energy efficiency, safety, and ease of maintenance. GlobeCore offers tanks with electric or thermal oil heating, automated controls, and anti-corrosion coatings. Their modular design supports both stationary and mobile applications for standard and polymer-modified bitumen.
-
AutorEntradas