enero 28, 2026 a las 9:45 pm en respuesta a: What vacuum oil filling station would you recommend for power transformers rated 110/220 kV, and what key specifications should be considered for this application? #332462Amanda MooreMiembro
For 110/220 kV power transformers, I’d recommend a mobile thermal-vacuum oil plant (GlobeCore UVM/CMM class) rather than a small UVD top-up unit, because at these voltages evacuation is required and you typically need full-scale oil heating, deep ???assing/dehydration, filtration, and stable filling on site. A practical reference model is GlobeCore CMM-10 (UVM-1015 mobile oil plant): it’s designed for installation/maintenance of HV equipment and provides vacuum treatment (water/gases removal) plus filtration, with capacity around 10 m³/h in degassing/drying/filtration mode (and higher in heating/filtration).
enero 27, 2026 a las 1:05 pm en respuesta a: How to calculate reactive power of a transformer? #332254Amanda MooreMiembroQ = ?(S² ? P²) or Q = V × I × sin?. Used in system studies and capacitor sizing.
enero 26, 2026 a las 8:07 pm en respuesta a: what is magnetic balance test in power transformers? #332111Amanda MooreMiembroThe magnetic balance test is used on three phase transformers to check core integrity and detect inter turn or inter phase faults. With the test, a single phase voltage is applied to one phase and induced voltages are measured in the other phases. In a healthy transformer, the measured voltages follow characteristic patterns depending on the connection group. Significant deviations indicate possible issues such as core damage, shorted turns or incorrect connections. It is a simple offline diagnostic that helps verify magnetic circuit symmetry after transport or repair.
enero 25, 2026 a las 9:45 pm en respuesta a: How is a substation power transformer inspected during planned maintenance outages? #331922Amanda MooreMiembroUtilities perform visual inspection, bushing checks, thermography, OLTC servicing, oil sampling for DGA and dielectric tests, and secondary wiring verification. Protective relays are tested, and tap changer contacts are cleaned or replaced.
enero 25, 2026 a las 1:47 pm en respuesta a: Where are power electronic traction transformers used in railway systems? #331863Amanda MooreMiembroTraction transformers are installed in locomotives, EMUs, and substations feeding railway electrification systems. They handle high overloads, harmonics, and regenerative braking conversion.
enero 25, 2026 a las 2:44 am en respuesta a: What determines power transformer temperature rise? #331777Amanda MooreMiembroTemperature rise is determined by total losses (core plus copper), cooling method, ambient temperature, and heat transfer efficiency. Radiators, fans, pumps, and internal oil ducts govern how quickly heat is removed. Winding design and current density influence copper losses; flux density affects core losses. Standards define allowable average and hot-spot rises above ambient based on insulation class. Operating beyond rated load or in high ambient conditions pushes temperatures higher and must be carefully managed.
enero 24, 2026 a las 7:47 pm en respuesta a: What applications use Square D power transformers? #331723Amanda MooreMiembroSquare D transformers are used in commercial buildings, industrial automation panels, and low-voltage distribution with integrated protection and control.
enero 24, 2026 a las 5:44 pm en respuesta a: What types of power transformers are used in solar plants? #331707Amanda MooreMiembroSolar plants use inverter step-up transformers (MV) and plant-level step-up transformers to transmission voltages, often with harmonic-tolerant designs.
enero 24, 2026 a las 11:49 am en respuesta a: How is an ac dc power transformer tested for core saturation and winding overheating during repair? #331661Amanda MooreMiembroSaturation tests verify magnetizing current versus voltage; winding overheating is assessed with temperature probes under controlled load. Insulation is checked via resistance and hipot tests.
enero 24, 2026 a las 4:52 am en respuesta a: What do power transformer repair services include for industrial customers? #331595Amanda MooreMiembroRepair services often include diagnostics (DGA, electrical tests, SFRA), de-tanking, inspection of core and windings, drying and reconditioning of insulation, rewinding if necessary, and replacement of bushings, gaskets, and OLTC components. Oil is filtered or replaced, and the cooling system is cleaned and tested. Final routine tests verify ratio, impedance, losses, and insulation strength. Many service providers also offer on-site commissioning, warranty on repairs, and recommendations for monitoring to extend remaining life.
enero 23, 2026 a las 7:45 am en respuesta a: What causes power transformer noise during operation? #331415Amanda MooreMiembroNoise stems mainly from core magnetostriction, winding vibrations, cooling equipment, and load-related forces. Flux density changes cause the core to «buzz,» while electromagnetic forces in windings under high current make conductors vibrate. Radiator fans and oil pumps add mechanical noise. Harmonics and overexcitation can significantly increase sound levels. Designers mitigate noise with improved core design, lower flux density, sound-damping structures, and quieter cooling systems, often to meet strict environmental and urban noise regulations.
enero 21, 2026 a las 5:44 pm en respuesta a: Where can power transformers be purchased for industrial use? #330996Amanda MooreMiembroIndustrial buyers purchase via OEM representatives, electrical distributors, EPC contractors, or direct procurement from transformer manufacturers with technical support.
enero 21, 2026 a las 3:55 am en respuesta a: How often should an oil breakdown voltage test be performed? #330774Amanda MooreMiembroThis is a correct and very reasonable approach. In practice, the transformer manufacturer’s instructions and local national standards always have priority, because they reflect design limits, warranty conditions, and regulatory requirements. Any oil treatment or monitoring program should first comply with those documents. At the same time, GlobeCore’s recommendation to perform a test once per month is well aligned with common utility practice for critical units, because monthly trends allow early detection of moisture or gas growth without excessive sampling. The key is consistency: regular testing under the same conditions is often more valuable than the exact interval itself.
enero 20, 2026 a las 9:40 pm en respuesta a: What are the parts of a power transformer and their functions? #330685Amanda MooreMiembroFunctions span flux transfer (core), electrical conversion (windings), insulation (oil/cellulose), interface (bushings), regulation (OLTC), and thermal management (radiators/fans).
enero 20, 2026 a las 3:59 pm en respuesta a: Is it necessary to remove the active part of the transformer when using the low-frequency drying (LFD) method? #330604Amanda MooreMiembroIn most practical cases, no – low-frequency drying is specifically designed to be performed without removing the active part from the tank. The method heats the windings by circulating low-frequency current directly through them while the core remains in place. This allows moisture to be driven out under controlled conditions, often combined with vacuum. Removing the active part is required only in exceptional cases, for example when severe mechanical damage or major refurbishment is planned, not for standard LFD drying.
Amanda MooreMiembroCopper losses from I²R heating, core losses from hysteresis/eddy effects, and stray/dielectric losses reduce efficiency.
enero 19, 2026 a las 7:15 pm en respuesta a: Which industries in India use power transformers? #330392Amanda MooreMiembroBeyond utilities, Indian power transformers are integral to manufacturing plants, oil and gas, mining, pulp and paper, ports, automotive clusters, metro/rail networks, and large commercial developments. They support process electrification, HVAC, water systems, and backup generation links. Because many facilities depend on high-reliability supply in regions with grid constraints, industrial campuses often own and operate their own substation transformers and associated protection systems.
enero 19, 2026 a las 9:23 am en respuesta a: How do AC power transformers convert voltage in mains systems? #330316Amanda MooreMiembroAC power transformers use electromagnetic induction. The primary winding creates a time-varying magnetic flux in the core; the secondary winding intercepts this flux and induces a voltage proportional to the turns ratio. Stepping up or down voltage allows economical transmission and safe utilization.
enero 18, 2026 a las 5:15 pm en respuesta a: Who are the top power transformer manufacturers in the USA? #330226Amanda MooreMiembro«Top» U.S. power transformer manufacturers typically refers to companies with large installed base, advanced design/testing capability, and strong utility references. They build medium and large power transformers, comply with IEEE/ANSI and NERC guidelines, and support grid modernization. Rankings change with mergers and capacity expansions, so technical content usually describes them as «leading U.S.-based transformer OEMs serving transmission, distribution, and industrial markets.»
noviembre 11, 2025 a las 8:03 am en respuesta a: Interested in the wind turbine gearbox oil change unit (CMM-GL). #327486Amanda MooreMiembroThe CMM-GL system performs automatic gearbox oil exchange and filtration for wind turbines. It supports operation at height up to 160 m and can be customized for local conditions. Full documentation and pricing will be sent.
-
AutorEntradas