enero 24, 2026 a las 11:24 pm en respuesta a: What topics are covered in an electric power transformer engineering PDF? #331751Nancy HarrisMiembro
Such PDFs summarize design fundamentals, insulation systems, thermal models, short-circuit withstand calculations, OLTC design, testing standards, protection, diagnostics, maintenance, and failure analysis, often with utility practices.
enero 24, 2026 a las 10:01 am en respuesta a: Where are medium power transformers installed within the grid? #331647Nancy HarrisMiembroSame as above: placed in MV yards, urban substations, renewable plants, campus substations, and industrial service points that require moderate capacity and robust short-circuit withstand.
enero 24, 2026 a las 8:28 am en respuesta a: What power transformer tests are performed before commissioning? #331623Nancy HarrisMiembroRoutine tests include winding resistance, ratio, vector group, insulation resistance, tan-delta, PD, induced/AC withstand, and OLTC checks.
enero 23, 2026 a las 11:59 pm en respuesta a: What role do power system transformers play in grid operations? #331557Nancy HarrisMiembroPower transformers step voltages up for transmission and down for distribution, matching levels for efficient energy transfer and load consumption.
enero 23, 2026 a las 1:27 pm en respuesta a: What are the power transformer parts and their functions? #331457Nancy HarrisMiembroParts include core, primary/secondary windings, tap changers, bushings, cooling, tank, and protection accessories.
enero 22, 2026 a las 9:45 am en respuesta a: What is the role of vacuum in the CMM-12R oil regeneration systems process? #331226Nancy HarrisMiembroVacuum promotes removal of dissolved gases and moisture, enhances filtration efficiency, and supports deep regeneration of oil chemistry, which is critical for restoring insulating properties.
enero 22, 2026 a las 1:55 am en respuesta a: What does a power transformer maintenance schedule include? #331113Nancy HarrisMiembroIt defines periodic testing intervals, component inspections, oil processing cycles, and refurbishment actions to manage aging.
enero 22, 2026 a las 12:48 am en respuesta a: How does the oil meter on the output hose contribute to service accuracy? #331097Nancy HarrisMiembroThe built-in oil meter provides precise measurement of oil volume delivered during refill or drained from the gearbox. Accurate accounting of lubricant volumes helps confirm full exchange, prevents over- or under-filling, and supports record-keeping for maintenance audits and oil life tracking.
enero 21, 2026 a las 9:49 pm en respuesta a: Why is gearbox flushing important before refilling with new oil? #331055Nancy HarrisMiembroGearbox flushing is critical because it removes residual worn particles, water, oxidation products, and other contaminants that standard draining cannot eliminate. During this process, flushing oil is pumped at pressure (up to 5 bar and heights up to 105 m) through internal gearbox channels to displace old contaminants. This helps prevent contamination of the new oil, ensuring the longevity and performance of the drivetrain.
enero 21, 2026 a las 8:14 am en respuesta a: What performance requirements apply to HV power transformers? #330836Nancy HarrisMiembroHV units must meet high BIL ratings, low PD levels, controlled losses, stable impedance, robust cooling, and meeting grid protection, harmonics, and transient requirements.
noviembre 11, 2025 a las 6:26 am en respuesta a: Need quotation for one CMM-0.6 degassing and filtration cart suitable for 220 V outlet for use in Norway. Is it normally available from stock? #327480Nancy HarrisMiembroThe CMM-0.6L is designed for transformer oil purification and degassing. It can operate on 220 V or 380 V depending on configuration. Production is made to order; current lead time and pricing will be provided.
noviembre 10, 2025 a las 11:34 pm en respuesta a: Request for budgetary price for the TOR-80 tester. #327454Nancy HarrisMiembroThe TOR-80 breakdown voltage tester measures dielectric strength up to 80 kV. A budgetary quotation and delivery time will be sent.
noviembre 10, 2025 a las 4:13 pm en respuesta a: A university requires a transformer oil breakdown voltage tester. Please provide a quotation for the TOR-80 model. #327420Nancy HarrisMiembroThe TOR-80 tester measures dielectric breakdown voltage up to 80 kV, suitable for educational and laboratory use. It includes automatic test sequences and IEC-compliant electrodes. Pricing and lead time will be provided.
noviembre 10, 2025 a las 1:31 am en respuesta a: Need a quote for the CMM-G oil changer unit. #327352Nancy HarrisMiembroThe CMM-G wind turbine gearbox oil changer allows full replacement of oil in turbine gearboxes, including filtration and heating. A quotation and delivery schedule will be sent.
noviembre 7, 2025 a las 9:53 am en respuesta a: Please quote CMM-0.6L to Puerto Cortes, Honduras, Central America. 220V, 60Hz, 1 Phase. #327098Nancy HarrisMiembroThe CMM-0.6L transformer oil purification unit operates at 600 L/h and can be configured for 220V, 60Hz, single-phase supply. We will provide a quotation including shipping to Puerto Cortes, Honduras.
noviembre 5, 2025 a las 12:11 pm en respuesta a: we need hydraulic oil purification can you help us to choose one. #326910Nancy HarrisMiembroFor hydraulic oil purification, GlobeCore offers vacuum dehydrators (CMM series) and fine filtration systems (CFU series). They remove water and solid particles, improving oil cleanliness and service life. Please specify oil viscosity, contamination type, and required capacity for proper selection.
septiembre 17, 2025 a las 9:06 am en respuesta a: What is the transformer oil filtration procedure? #325547Nancy HarrisMiembroThe procedure involves heating the oil, removing solid particles via filters, then applying vacuum dehydration and degassing. GlobeCore systems automate this process, ensuring IEC-compliant results without interrupting transformer operation.
septiembre 15, 2025 a las 8:09 am en respuesta a: What’s the best way to perform hydraulic oil filtration in industrial systems? #325401Nancy HarrisMiembroBest practices include using offline filtration carts or bypass systems. GlobeCore provides plug-and-play hydraulic oil filtration units with 3-5 stage filters, particle counters, and optional water separation for oils in injection molding, presses, and gearboxes.
septiembre 9, 2025 a las 8:31 pm en respuesta a: What does power transformer maintenance include? #325054Nancy HarrisMiembroIt includes oil testing (BDV, DGA, water content), thermal scans, vacuum oil filtration, and monitoring of core and windings. GlobeCore offers complete transformer service solutions – from on-site oil purification to deep regeneration and thermal vacuum drying.
septiembre 9, 2025 a las 12:52 pm en respuesta a: What is a bitumen tank heating system and why is it critical? #324968Nancy HarrisMiembroProper heating is essential to maintain bitumen viscosity for pumping and mixing. GlobeCore offers thermal oil and electric heating systems with precise control, ensuring energy efficiency and preventing overheating or degradation of the bitumen.
-
AutorEntradas