Ahmed Abdullah
Ahmed Abdullah
Debates en los que participa
Topics
Last answer
- Are there any problems with pumping and mixing polymer-modified bitumen at 120-140 °C due to its high viscosity?
- hace 1 semana, 5 días
- Is there any particular reason why the standard filter in the TOR-5 online monitoring system is 10 microns and not finer?
- hace 1 semana, 5 días
- Would like to know more about the unit, its maintenance, ability to handle modified emulsion preparation with latex, production rate, and general performance.
- hace 2 meses, 3 semanas
- I want to make an inquiry about the price and delivery date of TOR-80 breakdown voltage tester. Do you have an agent in China?
- hace 2 meses, 3 semanas
- Request for quotation for a transformer oil filtration plant (vacuum type) with capacity 6-10 kL/h, improving BDV from 20 to 70 kV and achieving moisture content below 3 ppm.
- hace 2 meses, 3 semanas
- Request for dealer price for TOR-100 breakdown analyzer with IEC 156 test vessel and mushroom electrodes.
- hace 2 meses, 3 semanas
- Preparing a maintenance area for transformers (on-site maintenance, oil sampling, purification, regeneration, and commissioning). Need equipment prices and training details.
- hace 2 meses, 3 semanas
- Looking for local availability of the CMM-10 machine and pricing information.
- hace 2 meses, 3 semanas
- Inquiry for a vacuum transformer drying plant suitable for transformers rated 1000-5000 kVA, including process duration information for comparison with the current method.
- hace 2 meses, 3 semanas
- A power engineering company plans to establish a transformer repair and manufacturing facility and is interested in acquiring a transformer vacuum furnace similar in design to the UVS-6S. The company requests information about total cost including supply, installation, and commissioning.
- hace 2 meses, 3 semanas