Como monitorar a acidez no óleo de transformador?
Asked: ตุลาคม 15, 2024 เวลา 8:25 am by Gregory
- This topic has 1 ข้อความตอบกลับ, 2 เสียง, and was last updated 7 months, 1 week มาแล้ว by James.
Answers
-
ตุลาคม 15, 2024 เวลา 8:36 am by James
A acidez é monitorada através do teste de número de neutralização (Acidez Total), que mede a quantidade de base necessária para neutralizar os ácidos presentes no óleo. Valores elevados indicam degradação do óleo e potencial corrosão dos componentes internos. Análises regulares são recomendadas para acompanhar a evolução da acidez. Se os níveis estiverem altos, processos de regeneração com equipamentos como os da GlobeCore podem reduzir a acidez, restaurando a qualidade do óleo.
Articles by Topic
- Powders vacuum drying machine BV-3000
- High-voltage circuit breakers oil filling machine UVD
- Insulating oil injection machine into disconnectors UVD
- Oil injection machine into cable joints UVD
- Dielectric fluid filling machine for gas-insulated bushings UVD
- Oil top-up machine for locomotive transformer bushings UVD
- Oil injection machine into oil-filled protective relays UVD
- Insulating oil filling machine in bushing production UVD
- Metered oil filling machine in dielectric test cells UVD
- Insulating liquid top-up machine in reactor bushings UVD
- High-voltage transformer bushings oil filling UVD
- Insulating oil filling machine for power reactors UVD-1000
- Oil filling machine for oil circuit breakers UVD-1000
- Oil transfer machine for shunt reactors and inductive equipment UVD-1000
- Regenerated transformer oil transporting machine UVD-1000
- Clean fluid transport system for hydraulic machinery UVD-1000
- Oil refilling machine for oil-filled relays and measuring devices UVD-1000
- Oil transport system for transformer production lines UVD-1000
- Compact oil filling unit for renewable energy transformers UVD-1000
- Oil transfer system for substations and municipal transformers UVD-1000
- Turbine oil antioxidant additives injection block USB-6
- Lubricants corrosion inhibitors injection block USB-6
- Banks transformers online drying system CMM-260C
- Telecommunication towers transformers online drying system CMM-260C
- Military bases transformers online drying system CMM-260C
- Data centers transformers online drying system CMM-260C
- Hospitals transformers online drying system CMM-260C
- Traffic control systems transformers online drying system CMM-260C
- Large sports arenas lighting transformers online drying system CMM-260C
- Chemical factories transformers online drying system CMM-260C
- Water treatment plants transformers online drying system CMM-260C
- Seaport transformers online drying system CMM-260C
- Subway transformers online drying system CMM-260C
- Railway transformers online drying system CMM-260C
- Medical transformers online drying system CMM-260C
Only registered users can answer. No account? Sign up!