GlobeCore FAQ
Can LFD be used when the transformer is still filled with oil, or does the oil need to be drained beforehand?
- This topic has 1 reply, 2 voices, and was last updated 2 months, 1 week ago by .
Answers
-
January 21, 2026 at 1:10 pm by Sonia Patel
In most LFD applications, the transformer is drained before drying, because effective moisture removal requires vacuum on the solid insulation and direct evaporation from paper surfaces. Oil strongly limits mass transfer and traps moisture. There are special variants where oil remains and is circulated or partially removed, but classical LFD is performed with the active part out of oil and under vacuum to achieve deep drying of thick cellulose.