What are the steps for installing a high voltage transformer bushing?
Asked: October 7, 2024 at 8:37 am by Haruto Tanaka
- This topic has 1 reply, 2 voices, and was last updated 1 year, 3 months ago by Eric King.
Answers
-
October 7, 2024 at 8:59 am by Eric King
Installation involves several key steps: preparing the transformer, ensuring the bushing is free of contaminants, and aligning it properly. The bushing is then inserted into the transformer’s tank, and electrical connections are made. Proper sealing to prevent oil leaks is critical, followed by insulation resistance tests and checking for mechanical stability. Finally, the bushing is monitored during initial operation for temperature changes and leaks.
Articles by Topic
- GlobeCore delivered three containerized transformer oil treatment complexes to Iraq
- GlobeCore CMM Transformer Oil Treatment Machines
- Cable oil purification machine CMM-1CO
- Wind farms step-up transformers oil degassing machine CMM-4/7
- X-ray transformer oil purifier CMM-0.6L
- Another Launch – GlobeCore’s Equipment Operational in the Netherlands
- Transformer Oil Drying
- Launching of the GlobeCore equipment in Jordan
- GlobeCore Participates in a Technology Seminar in Mexico
- A Technology Seminar in Mexico
- BV Transformer Evacuation System
- Another GlobeCore Seminar Held in Dubai
- Turbine Oil Purification Equipment
- GlobeCore Invites Visitors to a Seminar in Mexico
- GlobeCore to Hold a Seminar in Angola
- GlobeCore at China International Electric Power Exhibition-2019
- GlobeCore extiende la invitación para visitar la Conferencia de Tecnología Offshore-2019 en Houston
- GlobeCore Extends Invitation to Visit Offshore Technology Conference-2019 in Houston
- GlobeCore Invites Visitors to a Seminar in Dubai
- An Invitation from GlobeCore to Attend China International Electric Power Exhibition
- Commissioning of GlobeCore Equipment in Bangladesh
- Clarification of Diesel Fuel with the CMM-6RL system
- Oil Purification Equipment
- An Invitation from GlobeCore to Attend Our Seminar in Argentina
- GlobeCore at Sharjah Energy Meet 2019
- GlobeCore Holds Presentations In Saudi Arabia
- The Influence of Transformer Construction Materials on Transformer Oil Aging
- Power transformer maintenance
- Requirements for Transformer Oil
- A СММ-10 Unit Servicing Transformer Substations in Kenya
- Two Units Commissioned in Italy
- Liberia: Commissioning a New CMM-4
- Transformer oil filling
- Transformer Oil Degassing
- GlobeCore Goes to Denver for International Exhibition
Only registered users can answer. No account? Sign up!