GlobeCore FAQ
Topics
Last answer
- Request for dealer price for TOR-100 breakdown analyzer with IEC 156 test vessel and mushroom electrodes.
- 3 weeks, 4 days ago
- A university requires a transformer oil breakdown voltage tester. Please provide a quotation for the TOR-80 model.
- 3 weeks, 4 days ago
- Inquiry about whether the oil regeneration product for transformer oil can also be used for polishing distilled used motor oil. The distillation plant processes about 25 metric tons per day.
- 3 weeks, 4 days ago
- Request for quotation for the TOR-80 oil breakdown voltage tester, including payment terms and delivery time.
- 3 weeks, 4 days ago
- Request for offer for CMM-0.6L, CMM-1.0LT, and CMM-2.2LT units, including payment terms and delivery time. The goal is to achieve breakdown voltage above 30 kV/mm in 35/10 kV transformers.
- 3 weeks, 4 days ago
- Request for supply of an automatic kinematic viscosity meter with bath for testing transformer and lube oils. Equipment should include calibration service, training, spare parts, and comply with ASTM-D-445 / D-2170.
- 3 weeks, 4 days ago
- Request for detailed technical and commercial information on the lube oil filtration system suitable for reusing lubricants such as Rarus-429 and Pegasus-805. The inquiry includes questions about particulate and water removal, dirt retention, magnetic filters, and maintenance.
- 3 weeks, 4 days ago
- A company engaged in transformer oil purification and testing requires a portable transformer drying unit. Please confirm availability.
- 3 weeks, 4 days ago
- A distributor company is interested in cooperation and requests pricing and delivery terms for the TOR-3 Oil Tan Delta Tester.
- 3 weeks, 4 days ago
- Interested in adding gearbox oil replacement capability for wind turbine maintenance. Request for technical and budgetary quote for the CMM-G oil changer, including data sheet, dimensions, trailer type, delivery time, pricing, warranty, and transport terms.
- 3 weeks, 4 days ago
- Need a quotation for a Fuller’s Earth transformer oil regeneration system with 3000 L/h flow rate.
- 3 weeks, 4 days ago
- Inquiry about representatives in a specific region and request for two 30 m³ transformer oil storage tanks.
- 3 weeks, 4 days ago
- Interested in the TOR-80 breakdown voltage tester, previously used a similar model, and want to know when TOR-80 was developed and the price for a demonstration unit.
- 3 weeks, 4 days ago