Does the dosage of bitumen modifiers change the curing time?
Asked: January 21, 2026 at 8:10 am by 佐々木 篤司
- This topic has 1 reply, 2 voices, and was last updated 2 months, 4 weeks ago by Christopher Hansen.
Answers
-
January 21, 2026 at 8:24 am by Christopher Hansen
Yes, modifier dosage has a direct and often strong influence on curing time. Higher polymer content increases viscosity and swelling time, especially for SBS, so the digestion period must be longer to achieve full polymer swelling and phase inversion. At low dosages, curing may stabilize in tens of minutes, while at high dosages it can take several hours. That is why curing time is always optimized experimentally for each formulation, not fixed by temperature alone.
Articles by Topic
- GlobeCore’s Participation in IPSE TECH LATAM 2026
- GlobeCore Tech School Hosts a Webinar on Compact LT Series Transformer Oil Processing Equipment
- GlobeCore Representative Spoke at the International Transformer Maintenance Seminar
- El representante oficial de GlobeCore en México participó en la exposición Expo Energiza 2025
- GlobeCore’s Official Representative in Mexico Took Part in the Expo Energiza 2025 Exhibition
- GlobeCore presented the CMM-0.6L unit at the Workshop “Diagnóstico de Transformadores de Potencia” in Veracruz, Mexico
- GlobeCore delivered three containerized transformer oil treatment complexes to Iraq
- GlobeCore Shares Expertise on Transformer Oil Maintenance at Guadalajara Workshop
- Oil dewatering in power transformers
- FR3 vs mineral oil: comparison of transformer fluids
- Reactivation clay polishing system for oils and fuels
- Turbine oil filtration machine CMM-4,0F
- Hydraulic oil filtration machine CMM-4,0F
- Thermal fluid filtration CMM-4,0F
- Cutting oil filtration machine CMM-4,0F
- X-ray transformers oil filtration machine CMM-4,0F
- Fyrquel fire-resistant oil filtration machine CMM-4,0F
- Network distribution transformers vacuum drying oven US-6S
- Power transformers vacuum drying oven at electric power plants US-6S
- Traction transformers vacuum drying oven US-6S
- Mining power transformers vacuum drying oven US-6S
- Marine transformers vacuum drying oven US-6S
- Electric oven transformers vacuum drying oven US-6S
- Step-up transformers vacuum drying oven in wind power plants US-6S
- Oil and gas industry transformers vacuum drying US-6RL
- Airports transformers vacuum drying oven US-6S
- Medical transformers vacuum drying oven US-6S
- Railway transformers vacuum drying US-6S
- Subway transformers vacuum drying oven US-6S
- Seaport transformers drying oven US-6S
- Water treatment plants transformers vacuum drying oven US-6S
- Chemical factories transformers vacuum drying oven US-6S
- Large sports arenas lighting transformers vacuum drying oven US-6S
- Traffic control systems transformers vacuum drying oven US-6S
- Hospitals transformers vacuum drying oven US-6S
Only registered users can answer. No account? Sign up!